To the central content area

Soil and Groundwater Investigation and Verification Project

Absrtact
This project continues work in “Soil and Groundwater Investigation and Verification Project” of New Taipei district. Work contents include regular groundwater monitoring wells monitoring, patrol and maintenance work, gas station online declaration and on-site inspection, update the health risk assessment of polluted site, investigate sites with chlorinated hydrocarbon contamination of groundwater, make use of closed-circuit television (CCTV) monitoring site, soil and groundwater pollution site supervision, verification and inspection, management of soil and groundwater database, advocacy and administrative work. A total of 78 field monitoring wells were sampled for 97 times groundwater samples, with work achievement of 100 % in groundwater sampling work category in project contract. A total of 302 monitoring wells have carried out monitoring well internal functions and external appearance patrol and maintenance. The project maintained 10 groundwater monitoring wells external appearance, repaired 5 monitoring wells, maintained 19 monitoring wells internal functions, shifted 1 monitoring wells, and abolished 46 monitoring wells, etc.. On regular declared and modified monitoring document of gas station, 725 documents were examined, with work achievement of 100 % in gas station online declaration and on-site inspection. A total of 9 illustration meeting have carried out describing the regulations, underground storage tanks declaration, environmental advocacy, and underground storage tank liability insurance. A total of 53 polluted sites were patrolled for 499 times with set up the relevant inspection form, and also 57 various related planning documents were reviewed. Pollution improvement, 14 sites in New Taipei district have been completed. Among them, 10 sites have been verified.
Keyword
Soil and groundwater, pollution investigation, verification
Open
top